← Back to search

Drainage, Sewerage and Stormwater Labourer

821112 · Very Heavy Next-day ready

Description

Performs routine tasks in maintaining drainage, sewerage and stormwater systems.

Typical work tasks

  • Cleans and carries out minor repairs on stormwater drains and canals, and checks for cracks and leaks in sewerage systems; digs holes and shovels excavated material onto conveyors, wheelbarrows and trucks for removal.

Typical work environment

  • Works outdoors to lay drains and piping as well as sumps.
  • Works in most weather conditions other than heavy rain or similar.
  • May work in confined or awkward spaces and under buildings.
  • Frequently works in wet, dirty and smelly conditions.

Typical physical and mental demands

  • Heavy to very heavy physical demand levels.
  • Stands frequently for most work.
  • Occasionally walks about the work area to move piping, equipment and materials.
  • Occasionally sits or lies down when lagging or joining piping.
  • Frequently digs or shovels material into and out of trenches/drains.
  • May occasionally stretch out and down.
  • Occasionally squats, crouches or kneels.
  • Occasionally twists the body or neck.
  • Constantly works with plastic, copper, concrete and clay piping or tiles. Cuts or bruises to the skin may occur.
  • Frequently lifts and carries piping, fixing materials and tools.
  • Frequent repetitive hand and arm movements are required when digging, lagging and cutting piping.
  • Bends
  • Driving is frequently required if moving from job to job to carry out repair or installation work. May also operate trenching and digging machines.
  • Employees use a range of hand and power equipment/tools to carry out work tasks including sealing, cutting and jointing, as well as shovelling and digging.
  • Frequently climbs into and works in drains or other trenches sumps or underground tanks.
  • Mental skills necessary include practical and problem-solving skills.
Entry signal Reviewed

No formal entry barrier — can start without prior training. Flagged next-day ready.

Entry barrier No formal entry barrier
Licence / registration No licence required
ANZSCO skill level 5
Next-day ready Yes

How this was determined (model-generated): Nil entry requirements for a drainage/sewerage labourer.

Entry Requirements

  • Nil (ANZSCO Skill Level 5).

Further Comments

  • There are opportunities for flexibility of movement but they are limited.